Testing of solid oxide electrolyser stacks
Tender description
The subject of the contract is not related to the activities of the network sector listed in § 146-147 of the Estonian Public Procurement Act. The competition procedure is carried out in accordance with the Estonian Law of Obligations Act § 1009 - § 1013 and relevant legislation and instructions and other basic documents prepared by the Contracting Authority. Enefit Solutions AS, in collaboration with H2Electro OÜ, is developing a high-temperature solid oxide electrolyser prototype (approximately 10–12 kW capacity) capable of co-electrolyzing H₂O and CO₂ to produce hydrogen or syngas. To support this development, the Client seeks an experienced and qualified Contractor to perform comprehensive stack-level testing under realistic high-temperature operating conditions. / Kõrvaldamise alused ja kvalifitseerimistingimused: Vaata hanke alusdokumentidest
Awarded contracts
16.09.2025| Tenderer | Amount | Bids | Awarded |
|---|---|---|---|
| CENER ESP | 142 000 € | 1 | 05.09.2025 |
Source: Public Procurement Register open data. Amounts exclude VAT. The notice published in the Public Procurement Register is binding.